INSTALLATION OF CABLE TRAY AND PRIMARY TERMINATION,INSTALLATION OF FEEDERLINE, ELECTRICAL WORKS(STANDARD TRANSFORMER TESTING , CABLE INSULATION RESISTANCE TEST AND HI-POT TEST) @PLDT PASIG
JTI ELECTRICAL THERMOGRAPHI
-CSCANNING
ANNUAL ELECTRICAL PREVENTIVE MAINTENANCE
@
ANNUAL ELECTRICAL PREVENTIVE MAINTENANCE
INSTALLATION OF 3- 100kVAPOLE MOUNTED SINGLE PHASE DISTRIBUTION TRANSFORMER AND STANDARD TESTING @LIMA BATANGAS
PMS,OIL PURIFICATION OF POWER TRANSFORMER AND STANDARD TESTING @SUMINAC
@PMFTC
DEGASIFICATION OF 1 UNIT -1000kVA OIL IMMERSED POWER TRANSFORMER AND STANDARD TESTING @PHILNAK BATANGAS
OIL PURIFICATION OF 8- UNITS OIL IMMERSED THREE PHASE POWER TRANSFORMER AND STANDARD TESTING BEFORE/AFTER OIL PURIFICATION
@ BATANGAS
ANNUAL PREVENTIVE MAINTENANCE @ROHM
ANNUAL PREVENTIVE MAINTENANCE @MSL
CABLE TRENCHING AND BACK FILLING OF PRIMARY FEEDERLINE,INSTALLATION OF 110mm PVC ELECTRICAL CONDUIT
,TERMINATION OF PRIMARY FEEDER LINE,CONSTRUCTION OF CONCRETE PAD , INSTALLATION OF 1MVA POWER TRANSFORMER AND STANDARD TESTING @ LITTELFUSE BATANGAS
EARTH GROUNDING TEST@
MT. APO GEOTHERMAL
POWER PLANT
ANNUAL PREVENTIVE MAINTENANCE @ LUNG CENTER PHILIPPINES
STANDARD TESTING OF 25-UNITS POLE MOUNTED DRY-TYPE TRANSFORMER
@ ROBINA FARM
OIL REPLACEMENT, REGASKETTING,OIL DEGASIFICATION OF 1 UNIT
-500kVA OIL IMMERSED POWER TRANSFORMER AND STANDARD TESTING @WESTERN DIGITAL
Installation of 3sets Current Transformer (CT) 69kV
INSTALLATION OF NEW 3SETS CURRENT TRANSFORMER, TESTING AND COMMISSIONING
ELECTRICAL THERMOGRAPHIC SCANNING @ BDO (NCR) (290 BRANCHES)
COMPLETE RECONDITIONING OF 3- UNITS 2500kW(S16R- PTA MITSUBISHI) STANFORD GENERATOR SET @CENTRIS
PREVENTIVE MAINTENANCE OF 2- UNITS 1000kVA AND 500kVA CUMMINS STANDBY GENSET @ LUNG CENTER OF THE PHILIPPINES
PREVENTIVE MAINTENANCE OF 2- UNITS 600kW AND 350kW CATERPILLAR STANDBY GENSET
@ INSPIRO
COMPLETE RECONDITIONING OF 1- UNIT 37KW CYCLODRIVE MOTOR W/ GEARBOX(SUMITOMO) @EAGLE CEMENT
COMPLETE RECONDITIONING AND REWINDING OF 300kW, 275kW ,
500kW ,4160V MEDIUM VOLTAGE @EAGLE CEMENT
COMPLETE RECONDITIONING AND REWINDING OF 300HP 275kW, 200kW , LOW VOLTAGE INDUCTION MOTOR @PREMIUM MEGASTRUCTURE INC
COMPLETE RECONDITIONING AND REWINDING OF 300kW
,MEDIUM VOLTAGE ELECTRIC MOTOR @MAYNILAD WATER
COMPLETE RECONDITIONING OF 2 UNITS – SUBMERSIBLE PUMP ;10kW (IBARA) AND 150kW (SULZER) @WABAG
COMPLETE RECONDITIONING OF 2 UNITS – DC MOTOR;200KW AND 450KW @FF CRUZ , LAPUZ ILOILO CITY
Standard & Functionality Test of SF6 Dead Tank Circuit Breaker
➡ Purity Test for Gas & Moisture Contaminant
➡ Manual Closing/Opening, Tripping Contact
➡ Ckt Breaker timing test
➡ IR, IPF, Excitation test
➡ TTR, Winding Resistance Test per core of
CT,PT Metering and protection accuracy
@TAFT HYDRO EASTERN SAMAR
18 MVA POWER TRANSFORMER (DAIHEN)
➡ OIL FILLING (40 DRUMS OF MINERAL TRANSFORMER OIL)
➡ OIL PURIFICATION
➡ TRANSFORMER ASSEMBLY(SUCH AS COOLING FINS,BUCHHOLZ RELAY,ETC.)
➡ STANDARD TRANSFORMER STANDARD TESTING @ TAFT HYDRO EASTERN SAMAR
ONGOING PROJECTS
“INSTALLATION OF FIRST PRIVATE POLE, CONSTRUCTION OFCONCRETE PEDESTAL, TRANSFORMER PAD, CABLE TRENCHING, BACK FILLING AND INSTALLATION OF PVC CONDUIT FROM PEDESTAL TO POWER TRANSFORMER TO LVSG”
&
“STANDARD TESTING AND EXCITATION TEST OF 1 (UNIT) – (3MVA, 34.5 GRDY/19.92 KV, 480 Y/ 277 V) POWER TRANSFORMER , STANDARD TESTING OF LVSG, HVSG, INSULATION RESISTANCE TEST &HI –POT TESTING OF XLPE, POWER CABLE AND LIGHTNING ARRESTER”
INSTALLATION OF NEW 4MVA POWER TRANSFORMER
PLDT SMART IOC ELECTRICAL WORKS